The Pakistan Telecommunication Authority has begun a three-day survey of mobile network quality along the route from Islamabad to Multan, sending a field team onto the roads and into the cities to measure the service that millions of subscribers actually receive. The exercise, led by the authority’s Director General Enforcement, will test coverage, voice call quality, call connectivity and internet speeds at locations across the journey, with representatives of the mobile operators travelling alongside the regulator’s team.
The survey is currently under way in Multan city and its surrounding areas. It is the kind of hands-on check the PTA carries out regularly, but this one is unusually wide in scope, covering highways, urban centres and the towns in between, rather than a single city. For subscribers along the route, the results could decide whether their operator is told to fix dead zones and weak signals or given a clean bill of health.
PTA Tests Network Coverage and Internet Speeds
The assessment covers the four things that matter most to a mobile user: whether there is a signal at all, whether calls go through and stay connected, how clear those calls sound, and how fast mobile data actually runs. PTA officials and operator representatives are conducting the field tests together, measuring real performance on the ground rather than relying on coverage maps or figures reported by the companies themselves.
The team has also assessed network coverage and performance along the Islamabad to Multan Motorway, looking for the stretches where connectivity drops or disappears altogether. Motorways are a familiar weak spot for mobile users in Pakistan, where a call can cut out mid-conversation and data can vanish for kilometres at a time, and the regulator has made highway coverage a recurring part of its survey work.
Mobile Operators Told to Address Network Gaps
During a meeting with the mobile operators, the team led by the Director General Enforcement directed the companies to improve network coverage and ensure quality voice and data services. Operators were instructed to address network deficiencies, coverage gaps and problems affecting data services without delay, a message the regulator has delivered before but rarely with its own team standing in the area concerned.
The PTA team is also scheduled to meet representatives of fixed-line operators and other licensees in Multan later today. Tomorrow it will meet Syed Ali Qasim Gilani, the Member of the National Assembly from the area, before heading back. On the return journey, the team will assess mobile services along an alternative route covering Kabirwala, Jhang and Sargodha, extending the survey to towns that rarely feature in the regulator’s published checks.
The exercise reflects a regulator that has been using its enforcement powers more visibly. Over the past four years, the PTA has imposed fines of more than 3.41 billion rupees on mobile and internet companies for failing to meet quality-of-service standards, alongside 86 show-cause notices and 20 warning letters. In that period it has conducted more than 700 surveys, including over 500 quality-of-service checks in cities, rural areas, highways, motorways and along railway tracks, and more than 200 surveys prompted by public complaints.
Complaints remain the other half of the picture. In September 2026 alone, the PTA received 7,400 complaints and resolved 7,071 of them, a resolution rate of 95.55 percent. Jazz drew the most complaints at 3,005, followed by Telenor with 1,325, Zong with 1,309 and Ufone with 985. Consumers can lodge complaints through the PTA portal or its toll-free helpline at 0800-55055, and the regulator says the survey findings feed directly into the action it takes against operators.
Part of the problem lies beyond the operators’ control. Around 9,000 mobile sites, roughly 17 percent of the country’s total, are reported to be non-operational because of electricity load-shedding, disputes over right of way, power theft and the theft of equipment from telecom towers. A tower without power is a tower without a signal, and no amount of fine-tuning can fix a site that has been stripped of its batteries or cut off from electricity.
The three-day exercise aims to evaluate mobile network performance across highways, urban centres and surrounding localities, helping identify the areas where service quality and coverage need improvement. Its findings will show whether the operators’ promises match the experience of people travelling between two of Punjab’s biggest cities, and whether the regulator’s fines and warnings are translating into better signals on the ground. For the subscribers of Multan, Kabirwala, Jhang and Sargodha, the more important question is what happens after the team goes home: whether the gaps it finds are actually filled, or simply recorded for the next survey.
